| NOPSEMA | Memo – Operator Notified | 3 | NOPSEMA correspondence regarding a dropped object incident on the Northern Endeavour facility operated by Upstream Production… | Unknown | View |
| NOPSEMA | Memo – Further Information Supplied By UPS | 6 | NOPSEMA correspondence from July 2019 regarding a shutdown event on the Northern Endeavour floating production facility operated… | Unknown | View |
| NOPSEMA | Memo – Additional Info Supplied By UPS Post Inspection | 15 | Following a dropped object incident on 30 June 2019 at the North Rankin Complex (NE), Upstream Production Solutions submitted… | Unknown | View |
| NOPSEMA | File Note – CC Adhoc Meeting – Northern Endeavour – 09-07-2019 | 2 | NOPSEMA's Compliance Committee reviewed a short-notice inspection of Upstram Production Services' Northern Endeavour NOGA FPSO… | Unknown | View |
| NOPSEMA | Background Brief – Northern Endeavour – OHS Prohibition Notice & Ongoing Enforcement – 09-07-2019 | 3 | On 10 July 2019, NOPSEMA issued a Prohibition Notice to Upstream Production Solutions (UPS), operator of the Northern Endeavour… | Unknown | View |
| NOPSEMA | Notice – Issue Letter And Report – 10-07-2019 | 10 | NOPSEMA conducted an Occupational Health and Safety inspection of the Northern Endeavour - NOGA floating production facility… | Unknown | View |
| NOPSEMA | Re_request For CC Meeting – Northern Endeavour – 08-07-2019 | 4 | NOPSEMA internal correspondence from July 2019 regarding the Northern Endeavour NOGA FPSO facility documents regulatory… | Unknown | View |
| NOPSEMA | Thread – Final Report – FP – 14-08-2019 | 1 | NOPSEMA's final report (RMS ID 6027) from August 2019 addresses a failed produced water pipe support on an unnamed offshore… | Unknown | View |
| NOPSEMA | Notice – Final Report – RTN File Download Receipt – 14-08-2019 | 1 | On 13 August 2019, an operator submitted a 30-day incident report to NOPSEMA regarding a produced water pipe support failure on… | Unknown | View |
| NOPSEMA | Memo – Initial Report To Focal Point – 02-07-2019 | 2 | On 2 July 2019, NOPSEMA prepared an internal memo to serve as an initial report to a focal point regarding offshore petroleum… | Unknown | View |
| NOPSEMA | Memo – Initial Report Additional Information To Focal Point – 04-07-2019 | 2 | This July 2019 memo from NOPSEMA provides additional information regarding an initial report filed with a focal point, with four… | Unknown | View |
| NOPSEMA | Memo – RTN File Download Receipt – 12-08-2019 | 1 | NOPSEMA received a 30-day accident and dangerous occurrence report from Northern Endeavour on 10 August 2019 concerning a… | Unknown | View |
| NOPSEMA | Memo - To FP - Https___rms_incident_notifications_6027_details - 2019-07-05 | 1 | This July 2019 internal NOPSEMA memo reports an occupational health and safety incident at the Northern Endeavour offshore… | Unknown | View |
| NOPSEMA | Submission - Final Report - Pipe Support Failure | 12 | On July 4, 2019, a pipe support failure occurred at the Northern Endeavour facility in the Timor Sea, operated by Upstream… | Unknown | View |
| NOPSEMA | Submission - Final Report – LP Produced Water Pipe Support Failure | 6 | This NOPSEMA submission contains a final report documenting a produced water pipe support failure on the Laminaria Pioneer (LP)… | Unknown | View |
| NOPSEMA | Submission - Final Report - 5 Whys Work Sheet - Failed Produced Water Pipe Support Rev 2 | 4 | A 5 Whys incident investigation report documents a near-miss event involving a produced water pipe support failure on an… | Unknown | View |
| NOPSEMA | Submission - Final Report - LP Produced Water Pipe Support Failure - Secure File Transfer - 14-08-2019 | 6 | NOPSEMA released a final report documenting a produced water pipe support failure on the Laminaria Platform (LP). The report… | Unknown | View |
| NOPSEMA | Submission - Final Report (incomplete) - Pipe Support Dropped Object LP Flare Line - 10-08-2019 | 12 | On 30 June 2019, a pipe support dropped from the LP flare line at the Northern Endeavour facility (Timor Sea) operated by… | Unknown | View |
| NOPSEMA | Memo - Notified Dangerous Occurrences - Final Reports | 1 | NOPSEMA issued a follow-up memo on 8 August 2019 regarding two outstanding Dangerous Occurrence final reports from the Northern… | Unknown | View |
| NOPSEMA | Memo - Receipt Emailed To Sender - 08-07-2019 | 2 | On 7 July 2019, Upstream Production Solutions submitted a three-day incident report to NOPSEMA concerning a dangerous occurrence… | Unknown | View |
| NOPSEMA | Submission - Initial Report - Pipe Support Failure - 06-07-2019 | 12 | On 4 July 2019, a pipe support failure occurred at the Northern Endeavour facility in the Timor Sea (operated by Upstream… | Unknown | View |
| NOPSEMA | Submission - Initial Report Header - 06-07-2019 | 14 | On 7 July 2019, Upstream Production Solutions submitted a mandatory 3-day report to NOPSEMA regarding a dangerous occurrence on… | Unknown | View |
| NOPSEMA | Submission - Photo Evidence | 8 | I cannot provide a meaningful summary of this FOI disclosure because the document consists entirely of image files without… | Unknown | View |
| NOPSEMA | Submission - Initial Report Additional Information - SNE-Office-19070114570 | 2 | This document contains technical specifications and piping and instrumentation diagrams for offshore petroleum processing… | Unknown | View |
| NOPSEMA | Submission - Initial Report Additional Information - Dropped Object Summary - LP Flare Pipe Support | 7 | A NOPSEMA submission documents a dropped object incident involving a 5.7kg flare pipe support that fell from approximately 4… | Unknown | View |
| NOPSEMA | Memo - File Download Receipt For Initial Report Additional Information To Sender - 04-07-2019 | 1 | This document is a file download receipt confirming NOPSEMA received additional information submissions related to a dropped… | Unknown | View |
| NOPSEMA | Submission - Initial Report Additional Information - Secure File - 04-07-2019 | 1 | This email transmission from July 2019 documents NOPSEMA's receipt of additional information relating to a dropped object… | Unknown | View |
| NOPSEMA | Submission - Initial Report - Pipe Support Dropped Object LP Flare Line | 12 | On 30 June 2019, a pipe support dropped from the LP Flare Line at the Northern Endeavour facility in the Timor Sea (operated by… | Unknown | View |
| NOPSEMA | Submission - Initial Report - Dropped Object - 01-07-2019 | 1 | On 1 July 2019, the Northern Endeavour offshore facility submitted an initial dangerous occurrence report to NOPSEMA documenting… | Unknown | View |
| NOPSEMA | Memo - File Download Receipt For Initial Report To Sender - 02-07-2019 | 1 | On 1 July 2019, an operator submitted a dangerous occurrence report to NOPSEMA concerning the Northern Endeavour facility,… | Unknown | View |
| NOPSEMA | Memo – Focal Point Initial Notification | 1 | This internal NOPSEMA memo documents a dropped object incident notification involving a pipe support found on an offshore… | Unknown | View |
| NOPSEMA | A914244 - Letter From Santos To NOPSEMA Dated 15 February 2023 In Relation To The Barossa Gas Export Pipeline… | 3 | Santos submitted correspondence to NOPSEMA on 15 February 2023 regarding the Barossa Gas Export Pipeline Installation,… | Unknown | View |
| NOPSEMA | A911928 - Email Thread Between Santos And NOPSEMA In Relation To A Proposed Santos Meeting On Friday 3 February 2023 | 6 | Email correspondence between Santos and NOPSEMA regarding a meeting scheduled for 3 February 2023. Santos requested to remove… | Unknown | View |
| NOPSEMA | A915336 - NOPSEMA Internal Email Thread Documenting Notes From A Quarterly Meeting With Santos | 5 | NOPSEMA internal email from February 2023 documents notes from a quarterly strategic decommissioning meeting with Santos. The… | Unknown | View |
| NOPSEMA | A916151 - Email From Santos To NOPSEMA With A Letter From Santos To NOPSEMA Dated 24 February 2023 And Weekly Report… | 7 | Santos submitted its sixth weekly progress report to NOPSEMA on 24 February 2023 regarding compliance with General Direction… | Unknown | View |
| NOPSEMA | A914581 - Email From Santos To NOPSEMA With A Letter From Santos To NOPSEMA Dated 17 February 2023 And Weekly Report… | 8 | Santos submitted its fifth weekly progress report to NOPSEMA on 17 February 2023 regarding compliance with a General Direction… | Unknown | View |
| NOPSEMA | A912899 - Email From Santos To NOPSEMA With A Letter From Santos To NOPSEMA Dated 10 February 2023 And A Weekly Report… | 8 | On 10 February 2023, Santos submitted Weekly Report #4 to NOPSEMA regarding the Barossa Gas Export Pipeline Installation… | Unknown | View |
| NOPSEMA | A911667 - Letter From Santos To NOPSEMA With A Weekly Report, Letter From Santos To NOPSEMA Dated 1 February 2023 And… | 23 | Santos submitted a progress report on 3 February 2023 to NOPSEMA regarding compliance with a General Direction issued on 13… | Unknown | View |
| NOPSEMA | A909625 - Email From Santos To NOPSEMA With An Attached Letter From Santos To NOPSEMA Dated 27 January 2023 And The… | 8 | Santos submitted its second weekly progress report to NOPSEMA on 27 January 2023 regarding compliance with a General Direction… | Unknown | View |
| NOPSEMA | A908366 - Email Thread Between NOPSEMA And Santos With An Attached Letter From Santos To NOPSEMA Dated 20 January 2023… | 10 | This email thread documents Santos submitting its first weekly report to NOPSEMA on 20 January 2023 regarding the Barossa… | Unknown | View |
| NOPSEMA | A909262 - Media Release From NOPSEMA To A Media Entity Regarding Santos General Direction Dated 25 January 2023 | 2 | On 13 January 2023, NOPSEMA issued a General Direction to Santos NA Barossa Pty Ltd, SK E&S Australia Pty Ltd, and Santos… | Unknown | View |
| NOPSEMA | A909260 - Email From A Media Entity To NOPSEMA Regarding NOPSEMA Announcement On Santos’ Barossa Project Dated 25… | 1 | A Melbourne-based reporter inquired with NOPSEMA on 25 January 2023 about the availability of a notice issued to Santos… | Unknown | View |
| NOPSEMA | A909096 - Email Thread Between NOPSEMA And A Media Entity In Relation To The Santos General Direction With A Media… | 4 | NOPSEMA issued a General Direction to Santos NA Barossa Pty Ltd and related entities on 13 January 2023 regarding the Barossa… | Unknown | View |
| NOPSEMA | A908500 - Email From NOPSEMA To A Media Entity In Relation To The Santos General Direction With A Media Release… | 3 | On 13 January 2023, NOPSEMA issued a General Direction to Santos NA Barossa Pty Ltd, SK E&S Australia Pty Ltd, and Santos… | Unknown | View |
| NOPSEMA | A908795 - Email Thread Between NOPSEMA And A Media Entity In Relation To The ‘barossa - General Direction S574’ With A… | 5 | This email thread documents NOPSEMA's media communication regarding a General Direction issued under section 574 of the Offshore… | Unknown | View |
| NOPSEMA | A922495 - Email Thread Between NOPSEMA And Santos Regarding The Barossa Gas Export Pipeline Environment Plan General… | Unknown | NOPSEMA released email correspondence and attachments between the regulator and Santos regarding the Barossa Gas Export Pipeline… | Unknown | View |
| NOPSEMA | A914528 - NOPSEMA Internal Briefing Note On The Santos Barossa Gas Export Pipeline Installation Dated 20 February 2023. | 2 | NOPSEMA issued General Direction 1898 to Santos NA Barossa Pty Ltd and related entities on 13 January 2023 requiring assessment… | Unknown | View |
| NOPSEMA | A911055 - Email Thread Between NOPSEMA And Santos Regarding ‘santos Letter To Nopsema: Proposed Marine Surveys’ | 2 | In February 2023, NOPSEMA approved proposed marine survey activities by Santos associated with implementation of General… | Unknown | View |
| NOPSEMA | A911056 - Letter From Santos To NOPSEMA In Relation To Proposed Marine Surveys And The Barossa GEP Installation… | 2 | Santos wrote to NOPSEMA on 1 February 2023 responding to a General Direction issued on 13 January 2023 regarding the Barossa Gas… | Unknown | View |
| NOPSEMA | A903591 - Letter From Santos To NOPSEMA In Relation To The Barossa Gas Export Pipeline Installation Environment Plan… | 1 | Santos committed to NOPSEMA in December 2022 that it would not commence pipeline construction for the Barossa Gas Export… | Unknown | View |
NOPSEMA
Memo – Operator Notified
NOPSEMA correspondence regarding a dropped object incident on the Northern Endeavour facility operated by Upstream Production…
New
NOPSEMA
Memo – Further Information Supplied By UPS
NOPSEMA correspondence from July 2019 regarding a shutdown event on the Northern Endeavour floating production facility operated…
New
NOPSEMA
Memo – Additional Info Supplied By UPS Post Inspection
Following a dropped object incident on 30 June 2019 at the North Rankin Complex (NE), Upstream Production Solutions submitted…
New
NOPSEMA
File Note – CC Adhoc Meeting – Northern Endeavour – 09-07-2019
NOPSEMA's Compliance Committee reviewed a short-notice inspection of Upstram Production Services' Northern Endeavour NOGA FPSO…
New
NOPSEMA
Background Brief – Northern Endeavour – OHS Prohibition Notice & Ongoing Enforcement – 09-07-2019
On 10 July 2019, NOPSEMA issued a Prohibition Notice to Upstream Production Solutions (UPS), operator of the Northern Endeavour…
New
NOPSEMA
Notice – Issue Letter And Report – 10-07-2019
NOPSEMA conducted an Occupational Health and Safety inspection of the Northern Endeavour - NOGA floating production facility…
New
NOPSEMA
Re_request For CC Meeting – Northern Endeavour – 08-07-2019
NOPSEMA internal correspondence from July 2019 regarding the Northern Endeavour NOGA FPSO facility documents regulatory…
New
NOPSEMA
Thread – Final Report – FP – 14-08-2019
NOPSEMA's final report (RMS ID 6027) from August 2019 addresses a failed produced water pipe support on an unnamed offshore…
New
NOPSEMA
Notice – Final Report – RTN File Download Receipt – 14-08-2019
On 13 August 2019, an operator submitted a 30-day incident report to NOPSEMA regarding a produced water pipe support failure on…
New
NOPSEMA
Memo – Initial Report To Focal Point – 02-07-2019
On 2 July 2019, NOPSEMA prepared an internal memo to serve as an initial report to a focal point regarding offshore petroleum…
New
NOPSEMA
Memo – Initial Report Additional Information To Focal Point – 04-07-2019
This July 2019 memo from NOPSEMA provides additional information regarding an initial report filed with a focal point, with four…
New
NOPSEMA
Memo – RTN File Download Receipt – 12-08-2019
NOPSEMA received a 30-day accident and dangerous occurrence report from Northern Endeavour on 10 August 2019 concerning a…
New
NOPSEMA
Memo - To FP - Https___rms_incident_notifications_6027_details - 2019-07-05
This July 2019 internal NOPSEMA memo reports an occupational health and safety incident at the Northern Endeavour offshore…
New
NOPSEMA
Submission - Final Report - Pipe Support Failure
On July 4, 2019, a pipe support failure occurred at the Northern Endeavour facility in the Timor Sea, operated by Upstream…
New
NOPSEMA
Submission - Final Report – LP Produced Water Pipe Support Failure
This NOPSEMA submission contains a final report documenting a produced water pipe support failure on the Laminaria Pioneer (LP)…
New
NOPSEMA
Submission - Final Report - 5 Whys Work Sheet - Failed Produced Water Pipe Support Rev 2
A 5 Whys incident investigation report documents a near-miss event involving a produced water pipe support failure on an…
New
NOPSEMA
Submission - Final Report - LP Produced Water Pipe Support Failure - Secure File Transfer - 14-08-2019
NOPSEMA released a final report documenting a produced water pipe support failure on the Laminaria Platform (LP). The report…
New
NOPSEMA
Submission - Final Report (incomplete) - Pipe Support Dropped Object LP Flare Line - 10-08-2019
On 30 June 2019, a pipe support dropped from the LP flare line at the Northern Endeavour facility (Timor Sea) operated by…
New
NOPSEMA
Memo - Notified Dangerous Occurrences - Final Reports
NOPSEMA issued a follow-up memo on 8 August 2019 regarding two outstanding Dangerous Occurrence final reports from the Northern…
New
NOPSEMA
Memo - Receipt Emailed To Sender - 08-07-2019
On 7 July 2019, Upstream Production Solutions submitted a three-day incident report to NOPSEMA concerning a dangerous occurrence…
New
NOPSEMA
Submission - Initial Report - Pipe Support Failure - 06-07-2019
On 4 July 2019, a pipe support failure occurred at the Northern Endeavour facility in the Timor Sea (operated by Upstream…
New
NOPSEMA
Submission - Initial Report Header - 06-07-2019
On 7 July 2019, Upstream Production Solutions submitted a mandatory 3-day report to NOPSEMA regarding a dangerous occurrence on…
New
NOPSEMA
Submission - Photo Evidence
I cannot provide a meaningful summary of this FOI disclosure because the document consists entirely of image files without…
New
NOPSEMA
Submission - Initial Report Additional Information - SNE-Office-19070114570
This document contains technical specifications and piping and instrumentation diagrams for offshore petroleum processing…
New
NOPSEMA
Submission - Initial Report Additional Information - Dropped Object Summary - LP Flare Pipe Support
A NOPSEMA submission documents a dropped object incident involving a 5.7kg flare pipe support that fell from approximately 4…
New
NOPSEMA
Memo - File Download Receipt For Initial Report Additional Information To Sender - 04-07-2019
This document is a file download receipt confirming NOPSEMA received additional information submissions related to a dropped…
New
NOPSEMA
Submission - Initial Report Additional Information - Secure File - 04-07-2019
This email transmission from July 2019 documents NOPSEMA's receipt of additional information relating to a dropped object…
New
NOPSEMA
Submission - Initial Report - Pipe Support Dropped Object LP Flare Line
On 30 June 2019, a pipe support dropped from the LP Flare Line at the Northern Endeavour facility in the Timor Sea (operated by…
New
NOPSEMA
Submission - Initial Report - Dropped Object - 01-07-2019
On 1 July 2019, the Northern Endeavour offshore facility submitted an initial dangerous occurrence report to NOPSEMA documenting…
New
NOPSEMA
Memo - File Download Receipt For Initial Report To Sender - 02-07-2019
On 1 July 2019, an operator submitted a dangerous occurrence report to NOPSEMA concerning the Northern Endeavour facility,…
New
NOPSEMA
Memo – Focal Point Initial Notification
This internal NOPSEMA memo documents a dropped object incident notification involving a pipe support found on an offshore…
New
NOPSEMA
A914244 - Letter From Santos To NOPSEMA Dated 15 February 2023 In Relation To The Barossa Gas Export Pipeline…
Santos submitted correspondence to NOPSEMA on 15 February 2023 regarding the Barossa Gas Export Pipeline Installation,…
New
NOPSEMA
A911928 - Email Thread Between Santos And NOPSEMA In Relation To A Proposed Santos Meeting On Friday 3 February 2023
Email correspondence between Santos and NOPSEMA regarding a meeting scheduled for 3 February 2023. Santos requested to remove…
New
NOPSEMA
A915336 - NOPSEMA Internal Email Thread Documenting Notes From A Quarterly Meeting With Santos
NOPSEMA internal email from February 2023 documents notes from a quarterly strategic decommissioning meeting with Santos. The…
New
NOPSEMA
A916151 - Email From Santos To NOPSEMA With A Letter From Santos To NOPSEMA Dated 24 February 2023 And Weekly Report…
Santos submitted its sixth weekly progress report to NOPSEMA on 24 February 2023 regarding compliance with General Direction…
New
NOPSEMA
A914581 - Email From Santos To NOPSEMA With A Letter From Santos To NOPSEMA Dated 17 February 2023 And Weekly Report…
Santos submitted its fifth weekly progress report to NOPSEMA on 17 February 2023 regarding compliance with a General Direction…
New
NOPSEMA
A912899 - Email From Santos To NOPSEMA With A Letter From Santos To NOPSEMA Dated 10 February 2023 And A Weekly Report…
On 10 February 2023, Santos submitted Weekly Report #4 to NOPSEMA regarding the Barossa Gas Export Pipeline Installation…
New
NOPSEMA
A911667 - Letter From Santos To NOPSEMA With A Weekly Report, Letter From Santos To NOPSEMA Dated 1 February 2023 And…
Santos submitted a progress report on 3 February 2023 to NOPSEMA regarding compliance with a General Direction issued on 13…
New
NOPSEMA
A909625 - Email From Santos To NOPSEMA With An Attached Letter From Santos To NOPSEMA Dated 27 January 2023 And The…
Santos submitted its second weekly progress report to NOPSEMA on 27 January 2023 regarding compliance with a General Direction…
New
NOPSEMA
A908366 - Email Thread Between NOPSEMA And Santos With An Attached Letter From Santos To NOPSEMA Dated 20 January 2023…
This email thread documents Santos submitting its first weekly report to NOPSEMA on 20 January 2023 regarding the Barossa…
New
NOPSEMA
A909262 - Media Release From NOPSEMA To A Media Entity Regarding Santos General Direction Dated 25 January 2023
On 13 January 2023, NOPSEMA issued a General Direction to Santos NA Barossa Pty Ltd, SK E&S Australia Pty Ltd, and Santos…
New
NOPSEMA
A909260 - Email From A Media Entity To NOPSEMA Regarding NOPSEMA Announcement On Santos’ Barossa Project Dated 25…
A Melbourne-based reporter inquired with NOPSEMA on 25 January 2023 about the availability of a notice issued to Santos…
New
NOPSEMA
A909096 - Email Thread Between NOPSEMA And A Media Entity In Relation To The Santos General Direction With A Media…
NOPSEMA issued a General Direction to Santos NA Barossa Pty Ltd and related entities on 13 January 2023 regarding the Barossa…
New
NOPSEMA
A908500 - Email From NOPSEMA To A Media Entity In Relation To The Santos General Direction With A Media Release…
On 13 January 2023, NOPSEMA issued a General Direction to Santos NA Barossa Pty Ltd, SK E&S Australia Pty Ltd, and Santos…
New
NOPSEMA
A908795 - Email Thread Between NOPSEMA And A Media Entity In Relation To The ‘barossa - General Direction S574’ With A…
This email thread documents NOPSEMA's media communication regarding a General Direction issued under section 574 of the Offshore…
New
NOPSEMA
A922495 - Email Thread Between NOPSEMA And Santos Regarding The Barossa Gas Export Pipeline Environment Plan General…
NOPSEMA released email correspondence and attachments between the regulator and Santos regarding the Barossa Gas Export Pipeline…
New
NOPSEMA
A914528 - NOPSEMA Internal Briefing Note On The Santos Barossa Gas Export Pipeline Installation Dated 20 February 2023.
NOPSEMA issued General Direction 1898 to Santos NA Barossa Pty Ltd and related entities on 13 January 2023 requiring assessment…
New
NOPSEMA
A911055 - Email Thread Between NOPSEMA And Santos Regarding ‘santos Letter To Nopsema: Proposed Marine Surveys’
In February 2023, NOPSEMA approved proposed marine survey activities by Santos associated with implementation of General…
New
NOPSEMA
A911056 - Letter From Santos To NOPSEMA In Relation To Proposed Marine Surveys And The Barossa GEP Installation…
Santos wrote to NOPSEMA on 1 February 2023 responding to a General Direction issued on 13 January 2023 regarding the Barossa Gas…
New
NOPSEMA
A903591 - Letter From Santos To NOPSEMA In Relation To The Barossa Gas Export Pipeline Installation Environment Plan…
Santos committed to NOPSEMA in December 2022 that it would not commence pipeline construction for the Barossa Gas Export…
New